Large hydro solutions – on/off and control duty
VODOHOSPODÁRSKA VÝSTAVBA, Š.P. – RECONSTRUCTION OF CANAL LOCKS CONTROL AND CONSTRUCTION OF MECHANICAL ROOM OF HYDRAULIC STA-TIONS IN CANAL LOCKS SVD G-N, LEVEL GABČÍKOVO

The subject of this job was industrial work of huge importance for safe operation of shipping on Danube. It consisted of proposal, design, manufacture, implementation and putting into operation of two new hydraulic machinery rooms to assure reliable operation of locks inlet and outlet including new high-pressure pipelines and consequent reconstruction of controls / inlet and outlet drives. The Work consisted of civil part– namely construction of two buildings of machinery rooms, mechanical part– namely whole specially designed technology of efficient hydraulic aggregates, oil economy, including storage and tapping station.

A part of this was also design and manufacture of special pressurized lids assuring tightness of internal cavities at locks after disassembly of the original technology. The Work also consisted of electric and I&C part – namely complete development and manufacture of automatics to control technologies, new heavy current and weak current switchboards and distributions, including implementation into the central control system of the waterwork.

Key EPC
Description E725 - Fabrication and upgrade of canal locks VC, VB of 1. a 2. HVB
Beginning 2021
End 2023
End user ČEZ, a.s. NPP Temelín
Key EPC
Description F114 - Replacement of ČKD flaps on the external pipe in pipeline channel in front of cooling towers
Beginning 2023
End ongoing
End user ČEZ, a.s. NPP Temelín
Key EPC
Description Repair of 2 pcs intlet devices of TG2 VE Trenčín
Beginning 2023
End ongoing
End user Slovenské elektrárne, a.s.
Key EPC
Description Production and delivery of 2 pcs of outlet boards for TG1 Nové Mesto nad Váhom
Beginning 2019
End 2019
End user Slovenské elektrárne, a.s.
Key EOC
Description Repair of 2 pcs intlet devices of TG2 VE Trenčín
Beginning 2019
End 2020
End user Slovenské elektrárne, a.s.
Key EOC
Description Overhaul of 2 pcs inlet equipment of TG 2 Nosice
Beginning 2015
End 2016
End user Slovenské elektrárne, a.s.
Key EP
Description Production and delivery of 2 pcs of outlet boards Kostolná, Dubnica
Beginning 2015
End 2015
End user Slovenské elektrárne, a.s.
Key EP
Description Production and delivery of 4 pcs intlet boards, Horná Streda
Beginning 2016
End 2017
End user Slovenské elektrárne, a.s.
Key EPC
Description Repair of hydraulic system and control - Kosihy, Šahy, Sokolec
Beginning 2013
End 2013
End user SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
Key EOC
Description Repair of 2 pcs hydraulic cylinders for canal locks level Gabčíkovo
Beginning 2014
End 2014
End user Vodohospodárska výstavba, š.p.
Key PC
Description Production and delivery of 2 pcs outlet stop boards for TG1 VE Horná Streda and Kostolná
Beginning 2014
End 2015
End user Slovenské elektrárne, a.s.
Key EP
Description Repair of 2pcs canal cooling water feeders from VE Lipovec outlet – BO TG2“
Beginning 2014
End 2015
End user Slovenské elektrárne, a.s.
Key PC
Description Slepčany, VN Slepčany – repair of shutters
Beginning 2014
End 2015
End user SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
Key E
Description Hydraulic control of idle gate Sučany
Beginning 2014
End 2016
End user Slovenské elektrárne, a.s.
Key EPC
Description SVD G N Gabčíkovo- canal locks -relocation of hydraulic pipelines in turbine hall
Beginning 2014
End 2015
End user Vodohospodárska výstavba, š.p.
Key OC
Description Overhaul of flap valves TG1 and TG2 PVE Ružín including exchage of cooling water pipeline DN400 in flaps machine room
Beginning 2011
End 2012
End user Slovenské elektrárne, a.s.
Key EOC
Description Overhaul of hydraulic drives of control valves for inlets and outlets in canal locks of level Gabčíkovo
Beginning 2011
End 2011
End user Vodohospodárska výstavba, š.p.
Key EP
Description Reconstruction of canal locks control and construction of mechanical room of hydraulic stations in canal locks SVD G-N, level Gabčíkovo
Beginning 2011
End 2015
End user Vodohospodárska výstavba, š.p.
Key EPC
Description Production of hydraulic drives for central hurdle control of level Čuňovo
Beginning 2011
End 2011
End user Vodohospodárska výstavba, š.p.
Key EPC
Description Production and installation of 4 pieces double-shell tanks for hydraulic oil storage, á 5 m3, including electrical equipment and identification of leakages - for hydro-technical facility Gabčíkovo - inlet/ outlet
Beginning 2011
End 2014
End user Vodohospodárska výstavba, š.p.
Key EOC
Description Overhaul of 2 pcs of inlet equipment TG 3 Nosice
Beginning 2012
End 2013
End user Slovenské elektrárne, a.s.
Key PC
Description Repair of shutters VS Veľké Kozmálovce
Beginning 2012
End 2013
End user SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
Key EOC
Description Overhaul of 2 pcs inlet equipment of TG 3 Nosice / Repair of 2 pcs of piston rods of servomotors of fast closing valves in TG 3 Nosice
Beginning 2012
End 2013
End user Slovenské elektrárne, a.s.
Key E
Description Study - Hydraulic control of idle penstock in Krpeľany, Sučany, Lipovec
Beginning 2012
End 2012
End user Slovenské elektrárne, a.s.
Key PC
Description Repair of distribution pipeline shutters in VS Nováky (ŠŠ2)
Beginning 2013
End 2013
End user SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
Key PC
Description Repair of distribution pipeline shutters in VS Nováky (ŠŠ4)
Beginning 2013
End 2013
End user SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
Key EP
Description Production and delivery of 2 pcs of outlet boards Kostolná, Dubnica
Beginning 2013
End 2013
End user Slovenské elektrárne, a.s.
Key PC
Description Automatisation of distribution pipeline shutters on VS Nováky (N. Rudno)
Beginning 2013
End 2013
End user SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
Key OC
Description Hurdle Bošany MVE repair of turbine
Beginning 2013
End 2013
End user SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
Key EPC
Description VS Veľké Kozmálovce repair of heating I.hurdle field
Beginning 2013
End 2014
End user SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
Key Description Beginning End End user
EPC E725 - Fabrication and upgrade of canal locks VC, VB of 1. a 2. HVB 2021 2023 ČEZ, a.s. NPP Temelín
EPC F114 - Replacement of ČKD flaps on the external pipe in pipeline channel in front of cooling towers 2023 ongoing ČEZ, a.s. NPP Temelín
EPC Repair of 2 pcs intlet devices of TG2 VE Trenčín 2023 ongoing Slovenské elektrárne, a.s.
EPC Production and delivery of 2 pcs of outlet boards for TG1 Nové Mesto nad Váhom 2019 2019 Slovenské elektrárne, a.s.
EOC Repair of 2 pcs intlet devices of TG2 VE Trenčín 2019 2020 Slovenské elektrárne, a.s.
EOC Overhaul of 2 pcs inlet equipment of TG 2 Nosice 2015 2016 Slovenské elektrárne, a.s.
EP Production and delivery of 2 pcs of outlet boards Kostolná, Dubnica 2015 2015 Slovenské elektrárne, a.s.
EP Production and delivery of 4 pcs intlet boards, Horná Streda 2016 2017 Slovenské elektrárne, a.s.
EPC Repair of hydraulic system and control - Kosihy, Šahy, Sokolec 2013 2013 SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
EOC Repair of 2 pcs hydraulic cylinders for canal locks level Gabčíkovo 2014 2014 Vodohospodárska výstavba, š.p.
PC Production and delivery of 2 pcs outlet stop boards for TG1 VE Horná Streda and Kostolná 2014 2015 Slovenské elektrárne, a.s.
EP Repair of 2pcs canal cooling water feeders from VE Lipovec outlet – BO TG2“ 2014 2015 Slovenské elektrárne, a.s.
PC Slepčany, VN Slepčany – repair of shutters 2014 2015 SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
E Hydraulic control of idle gate Sučany 2014 2016 Slovenské elektrárne, a.s.
EPC SVD G N Gabčíkovo- canal locks -relocation of hydraulic pipelines in turbine hall 2014 2015 Vodohospodárska výstavba, š.p.
OC Overhaul of flap valves TG1 and TG2 PVE Ružín including exchage of cooling water pipeline DN400 in flaps machine room 2011 2012 Slovenské elektrárne, a.s.
EOC Overhaul of hydraulic drives of control valves for inlets and outlets in canal locks of level Gabčíkovo 2011 2011 Vodohospodárska výstavba, š.p.
EP Reconstruction of canal locks control and construction of mechanical room of hydraulic stations in canal locks SVD G-N, level Gabčíkovo 2011 2015 Vodohospodárska výstavba, š.p.
EPC Production of hydraulic drives for central hurdle control of level Čuňovo 2011 2011 Vodohospodárska výstavba, š.p.
EPC Production and installation of 4 pieces double-shell tanks for hydraulic oil storage, á 5 m3, including electrical equipment and identification of leakages - for hydro-technical facility Gabčíkovo - inlet/ outlet 2011 2014 Vodohospodárska výstavba, š.p.
EOC Overhaul of 2 pcs of inlet equipment TG 3 Nosice 2012 2013 Slovenské elektrárne, a.s.
PC Repair of shutters VS Veľké Kozmálovce 2012 2013 SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
EOC Overhaul of 2 pcs inlet equipment of TG 3 Nosice / Repair of 2 pcs of piston rods of servomotors of fast closing valves in TG 3 Nosice 2012 2013 Slovenské elektrárne, a.s.
E Study - Hydraulic control of idle penstock in Krpeľany, Sučany, Lipovec 2012 2012 Slovenské elektrárne, a.s.
PC Repair of distribution pipeline shutters in VS Nováky (ŠŠ2) 2013 2013 SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
PC Repair of distribution pipeline shutters in VS Nováky (ŠŠ4) 2013 2013 SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
EP Production and delivery of 2 pcs of outlet boards Kostolná, Dubnica 2013 2013 Slovenské elektrárne, a.s.
PC Automatisation of distribution pipeline shutters on VS Nováky (N. Rudno) 2013 2013 SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
OC Hurdle Bošany MVE repair of turbine 2013 2013 SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.
EPC VS Veľké Kozmálovce repair of heating I.hurdle field 2013 2014 SLOVENSKÝ VODOHOSPODÁRSKY PODNIK, š.p.